Skip to content
  1. Home
  2. Our work

Global industrial equipment manufacturer

A SharePoint 2010 migration assessment for an Office 365 rollout

We assessed the manufacturer’s production SharePoint 2010 farm and planned the move to Office 365. The roadmap put early adoption of SharePoint Online and Teams ahead of the global rollout.

Industry
Industrial manufacturing / Workplace IT
Platform
SharePoint 2010 and Office 365
Timeline
2019
Stage
Delivered assessment
Illustration: an industrial compressor with floating data panels
  • Assessment of the production SharePoint farm

  • Implementation guides for SharePoint Online and Teams

  • Roadmap through legacy farm retirement

The challenge

The challenge

Employees could not reach the intranet or collaboration sites from mobile devices. The central farm served a global workforce, and even a branded internal site took substantial effort to build.

Approach

Assess the production farm

We ran the SharePoint Migration Assessment Tool against the live farm. The assessment gave IT a starting point for the move, including the need for employees to reach the intranet from mobile devices.

Configure the new services

We delivered SharePoint Online configuration guidance for Office 365 E3 and an implementation guide for Teams. We also set out the security requirements for the new services.

Sequence the rollout

The roadmap started with early adopters of Teams and SharePoint Online. It set out when to launch the intranet and when IT could retire the legacy farm.

Results

The outcome

The workplace team had a migration assessment and a rollout plan it could use to prepare for retirement of the SharePoint 2010 farm.

Stack

Technology used

  • SharePoint 2010
  • SharePoint Migration Assessment Tool
  • Office 365 E3
  • SharePoint Online
  • Microsoft Teams

Client and delivery-partner names are withheld.

Research paper

The enterprise AI pilot paradox: Why pilots multiply while production stalls

Why most AI pilots never reach production, and the operating model that fixes it.

Read the paper
Get the designed PDF

Start with your workflow.

We define the scope and acceptance criteria with you, in writing, before the build starts. Wider programs are scoped separately, and commercial terms are set in the statement of work.

  • Built to SOC 2, HIPAA and GDPR standards
  • EU AI Act-aligned delivery
  • Microsoft Solutions Partner